Introduce Multiple Maintenance KPIs with an Enhanced Counter Plan in SAP EAM

Introduce Multiple Maintenance KPIs with an Enhanced Counter Plan in SAP EAM

Reading time: 12 mins

Learn about the detailed process of setting up enhanced multiple counter plans in SAP Enterprise Asset Management (EAM). With this preventive plan, you can maintain assets using multiple cycle sets. Each cycle set can correspond to a specific counter-based (performance-based) reading or to the lifetime of the equipment. After meeting the defined criteria of preventive…

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

More Resources